渣浆泵选型您现在的位置是:首页>>行业资讯>>渣浆泵选型

  • 液下渣浆泵装配程序
  • 作者: 浏览次数:
    液下渣浆泵普通在业内浅显的指SP(SPR)系列渣浆泵,它同时属于立式渣浆泵,但是业内所说的立式渣浆泵普通指的是ZJL立式渣浆泵,今天我们就来分享一下液下渣浆泵的装配程序。

    液下渣浆泵装配程序:
    1.将轴承分别装在轴承盒和轴承座上。

    2.将轴装入轴承座,用螺栓固定,拧上调整螺钉,并将轴承装置在支承座上,将挡水圈套在下部轴承处的恰当位置。

    3.将毛毡圈装在轴承端盖甲、丙和轴承盒上。

    4.将轴承端盖乙、丙装在轴承座上并用螺栓紧固。

    5.将装好轴承的轴承盒穿在轴上,拧上圆螺母,并将轴承端盖甲紧固在轴承盒上。

    6.电机支承装置在轴承座上用螺栓紧固,在轴的上端装联轴器部件,并将电机联轴器用紧固螺钉紧固在电机轴头上,将电机装在电机支承上,并用螺栓,螺母紧固。

    7.将联接收固定在轴承座上,并在联接收下部装上泵盖,在轴下部装上叶轮并拧紧,依次装上泵体前盖,并螺栓固定,用轴承盒处的调整螺钉调整叶轮与前盖间的间隙,调好后用螺母,螺栓紧固。

    8.从泵的出品次第将石棉垫,出液弯头、出液管件装上,并固定在支承座上。


    Submerged slurry pump generally refers to sp (SPR) series slurry pump in the industry, which also belongs to vertical slurry pump. However, the vertical slurry pump in the industry generally refers to ZJL vertical slurry pump. Today we will share the assembly procedure of submerged slurry pump.
    Assembly procedure of submerged slurry pump:
    1. Install the bearing on the bearing box and bearing seat respectively.
    2. Install the shaft into the bearing seat, fix it with bolts, screw in the adjusting screw, install the bearing on the support seat, and put the water retaining ring at the appropriate position of the lower bearing.
    3. Install the felt ring on bearing end covers a, C and bearing box.
    4. Install bearing end caps B and C on the bearing seat and fasten them with bolts.
    5. Thread the bearing box with the bearing installed on the shaft, screw on the round nut, and fasten the bearing end cover a on the bearing box.
    6. The motor support is installed on the bearing seat and fastened with bolts. The coupling parts are installed on the upper end of the shaft, and the motor coupling is fastened on the motor shaft head with fastening screws. The motor is installed on the motor support and fastened with bolts and nuts.
    7. Fix the connecting pipe on the bearing seat, install the pump cover at the lower part of the connecting pipe, install the impeller at the lower part of the shaft and tighten it, install the front cover of the pump body in turn and fix it with bolts, adjust the gap between the impeller and the front cover with the adjusting screw at the bearing box, and tighten it with nuts and bolts after adjustment.
    8. Install the asbestos pad, liquid outlet elbow and liquid outlet pipe fittings from the production sequence of the pump and fix them on the support seat.